Turnkey contracts to replace Pan Borneo Highway’s PDP construction model | The Malaysian Insight

Sverige Nyheter Nyheter

Turnkey contracts to replace Pan Borneo Highway’s PDP construction model | The Malaysian Insight
Sverige Senaste nytt,Sverige Rubriker
  • 📰 msianinsight
  • ⏱ Reading Time:
  • 20 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 11%
  • Publisher: 63%

Turnkey contracts to replace Pan Borneo Highway’s PDP construction model

Visitors posing for photos at the point where the Pan Borneo Highway starts in Sematan, on the southern tip of Sarawak. The highway's current project delivery partner model for construction is seen as less favourable, compared to the fixed-cost turnkey contract structure. – The Malaysian Insight pic, March 21, 2019.

PUTRAJAYA is looking to scrap the project delivery partner model in the RM29 billion Pan Borneo Highway and replace it with a turnkey contract model,The decision was made after the 5,324km project saw a cost overrun under the current PDP structure. Effective July 2018, access to full reports will only be available with a subscription. Sign-up now and enjoy one week free access!

Vi har sammanfattat den här nyheten så att du kan läsa den snabbt. Om du är intresserad av nyheterna kan du läsa hela texten här. Läs mer:

msianinsight /  🏆 8. in MY

Sverige Senaste nytt, Sverige Rubriker

Similar News:Du kan också läsa nyheter som liknar den här som vi har samlat in från andra nyhetskällor.

Expert warns of human-wildlife conflict if highway cuts through forest reservesExpert warns of human-wildlife conflict if highway cuts through forest reservesBenoit Goossens says parts of the Pan Borneo Highway will go through Class 1 forest reserves, affecting wildlife such as elephants, sun bears and clouded leopards.
Läs mer »

Superbikers on 3,000km ride to discover Sabah and SarawakSuperbikers on 3,000km ride to discover Sabah and SarawakKUCHING: A group of big bikers are rumbling along the Pan Borneo Highway on a 3,000km ride to discover sabah and Sarawak.
Läs mer »

PIL1 hit by bridging loan setbackPIL1 hit by bridging loan setbackGEORGE TOWN: The proposed Pan Island Link 1 (PIL1) highway project has hit a snag after the state government failed to obtain a RM1bil bridging loan.
Läs mer »

Private sector interested to build new highway in Kedah, says Mukhriz | The Malaysian InsightPrivate sector interested to build new highway in Kedah, says Mukhriz | The Malaysian InsightHowever, state government will decide on choice of highway network before accepting more proposals.
Läs mer »

Suspected waste-dumping site found along Johor highway | The Malaysian InsightSuspected waste-dumping site found along Johor highway | The Malaysian InsightSurvey by Bernama shows heavy machinery carrying out disposal works.
Läs mer »



Render Time: 2025-08-27 20:45:44