UPDATED: No timing set for return of LRT service

Sverige Nyheter Nyheter

UPDATED: No timing set for return of LRT service
Sverige Senaste nytt,Sverige Rubriker
  • 📰 OttawaCitizen
  • ⏱ Reading Time:
  • 47 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 22%
  • Publisher: 68%

The department is exercising an \u0022abundance of caution\u0022 after a bearing issue was discovered during a routine inspection, the email stated.

“Every vehicle was removed from the line and Alstom is investigating everything out of an abundance of caution,” Amilcar said.“I want you to know that every single axle we carry will be carefully inspected and will not return to service. We will not return to service until I am convinced it is safe for our customers and our staff.

Until further notice, R1 bus services service will be operating from Tunney’s Pasture to Blair Station, from 5 a.m. until 1 a.m. daily. On Tuesday, 28 buses were in operation. Part of the testing will be looking at different loading scenarios, such as those experienced with high volumes during Bluesfest in recent weeks.

“And it was during that detailed inspection that we discovered that the limits of that looseness has been exceeded.”Article contentServing 13 stations, the $2.1 billion Confederation Line has suffered a long series of breakdowns since its launch four years ago. The LRT operator’s warning averted a possible derailment on the Confederation Line due to an axle hub that was on the verge of “catastrophic failure,” said the TSB in an advisory letter to the city released in February. Parts on Ottawa’s trains have been wearing out early and “well below industry standards for cartridge assemblies.”

Vi har sammanfattat den här nyheten så att du kan läsa den snabbt. Om du är intresserad av nyheterna kan du läsa hela texten här. Läs mer:

OttawaCitizen /  🏆 21. in CA

Sverige Senaste nytt, Sverige Rubriker

Similar News:Du kan också läsa nyheter som liknar den här som vi har samlat in från andra nyhetskällor.

LRT Line 1 shut down, replacement bus service launched after issue found with bearingLRT Line 1 shut down, replacement bus service launched after issue found with bearingThe department is exercising an \u0022abundance of caution\u0022 after a bearing issue was discovered during a routine inspection, the email stated.
Läs mer »

All LRT service suspended due to bearing issueAll LRT service suspended due to bearing issueBREAKING: All trains on Ottawa's Confederation Line LRT have been stopped and all stations have been closed because of a bearing issue that was discovered during a routine inspection. ottnews ottawalrt
Läs mer »

Here's what we know about Ottawa's latest LRT shutdownHere's what we know about Ottawa's latest LRT shutdownAll trains on Ottawa's Confederation Line LRT have been stopped and all stations have been closed until further notice because a bearing issue was discovered during a vehicle inspection. All axles must be examined. ottnews
Läs mer »

Queensway to close again this month, this time for LRT workQueensway to close again this month, this time for LRT workThe city of Ottawa says Hwy. 417 will close again in both directions at the end of the month for LRT construction, two weeks after a major closure on Highway 417 to replace the Bronson Avenue Bridge.
Läs mer »



Render Time: 2025-08-27 20:11:57